How to Write a Landscape Maintenance RFP for Your HOA in El Paso

Published November 18, 2026 · El Paso Commercial Landscaping

Most HOA landscape maintenance RFPs in El Paso are lightly edited versions of a template written for a climate with summer rain. They ask about mowing frequency in detail and about irrigation almost not at all, which is exactly backwards for the Chihuahuan Desert.

The result is a stack of bids that cannot be compared. This guide walks through what to put in the document so that every proposal you get back is describing the same job, with the desert-specific clauses that generic templates leave out.

Start with a property inventory, not a scope

Before you write a single requirement, write down what you have. Contractors cannot price what they cannot see, and an inventory in the RFP itself removes the single largest source of bid variance.

Include, at minimum:

  • Total common-area acreage, broken into turf, planted beds, and rock or decomposed granite
  • Approximate linear feet of curb, walk, and mow-strip edge
  • Number of irrigation zones and controllers, with make and model if known
  • Tree count by rough size class, and any known problem trees
  • Slopes, arroyos, and retention or detention basins
  • Entry monuments, medians, and any area maintained for the city or a neighbouring parcel
  • A site map with the common areas outlined

If you do not have this information, say so plainly and schedule a mandatory walk-through. That is far better than letting each bidder guess differently.

Make irrigation its own section

This is the clause most templates are missing, and it is the one that determines whether your bids are honest. In this climate the irrigation system is the landscape's life support, and its current condition is the largest unknown in any proposal.

Specify:

  • A documented zone audit. Require bidders to run every zone during the walk-through and report what they find. This single requirement filters out anyone pricing from an aerial photo.
  • Who programmes the controller, and how often. Run times should change seasonally. State whether the contractor adjusts them and whether the board is notified.
  • A repair threshold. Name a dollar figure below which repairs are included in the contract and above which they need approval. Without this, you cannot compare a bid that includes repairs against one that does not.
  • Response time for a visible leak or break. A broken mainline in July is an emergency, not a next-visit item.
  • Drip-specific maintenance. If the property has drip zones, require filter cleaning, line flushing, and emitter checks on a stated schedule. Drip fails silently.
  • Backflow testing. State whether the contractor coordinates it or the association handles it directly.

Specify the seasonal calendar, not just a visit count

"Weekly service" means something very different in June than in January here. Bermuda turf grows hard through the summer and goes dormant in winter; overseeded rye, if the property has it, inverts part of that pattern. A flat annual visit count invites bidders to assume whichever distribution makes their number look best.

Instead, state the expectation by season:

  • Spring: irrigation startup and full audit, bed cleanout, pre-emergent application, mulch and aggregate refresh, first cuts
  • Summer: peak mowing frequency, weed control, monsoon debris response, leak watch
  • Fall: leaf and seed-pod removal, structural pruning begins, run-time reduction, overseeding if applicable
  • Winter: reduced mowing, dormant pruning, freeze protection, winterisation

Ask bidders to confirm or propose changes to this calendar rather than inventing their own, so the proposals line up.

The desert-specific clauses templates leave out

Monsoon and storm response

Summer storms here arrive fast and move a lot of material. Specify what happens after one: who clears washed decomposed granite off walks and out of drains, who removes downed limbs, what the response window is, and whether it is in the base contract or billed separately. Without this clause you will be negotiating during the emergency.

Wind-blown debris and litter

Spring wind in El Paso pins trash against fence lines, oleander hedges, and retention basins. If you want it collected, say so and say how often. Contractors who have worked here will have priced it. Contractors who have not will be surprised by it.

Rock and decomposed granite areas

Make explicit that aggregate areas are maintained, not merely present. Require weed control within the rock, raking, and periodic top-off, and state who supplies the material. A board that assumes rock is maintenance-free will be unhappy by the second summer.

Freeze events

Hard freezes are infrequent but not rare, and they damage both plant material and irrigation components. State expectations for winterisation beforehand and for assessment and repair afterwards, including who bears the cost of freeze-damaged backflow devices.

Watering compliance

Require the contractor to programme irrigation in compliance with current El Paso Water rules, and to notify the board if the schedule the property needs conflicts with what the rules permit. El Paso Water's published watering schedule restricts outdoor watering from April 1 through September 30 to before 10 a.m. or after 6 p.m. Make compliance a contractual obligation rather than an assumption, and have the contractor confirm which day assignment applies to your property.

Ask for the documentation you will actually need

Rather than listing credentials you assume exist, ask each bidder to supply what your approval process requires along with the proposal — vendor onboarding forms completed to your specification, references from comparable properties, and whatever documentation your management company or insurer asks for. Specify the format and the deadline. A contractor who delivers a complete, correctly formatted package on time is demonstrating something useful about how they will handle your service reports later. Our contractor bidding page describes what we include and why.

Structure the pricing so bids are comparable

Dictate the pricing format. If every bidder returns a different structure, the board spends its meeting doing arithmetic instead of evaluating contractors. Request:

  • A monthly base price for the routine maintenance scope
  • Seasonal cleanups priced separately, per event
  • An hourly rate for irrigation repair labour, plus the markup on parts
  • Unit pricing for common extras: shrub replacement, tree removal by size class, aggregate top-off per ton
  • A mobilisation or first-visit catch-up price, if the property has been neglected
  • Any proposed annual escalation, stated as a percentage

That last one matters more than boards expect. A three-year contract with an unstated escalator is not a three-year price.

Set evaluation criteria before the bids arrive

Decide — and publish in the RFP — how you will weigh price against scope completeness, local experience, references, and responsiveness during the bid process itself. Boards that skip this step default to choosing the lowest number, which is how properties end up re-bidding eighteen months later.

A reasonable split for an HOA is something like half on price, a quarter on demonstrated understanding of the property, and the remainder on references and documentation quality. Publish whatever you choose. It makes the decision defensible to the membership.

Practical timeline

  1. Six to eight weeks out: issue the RFP and schedule the mandatory walk-through
  2. Four weeks out: hold the walk-through; collect written questions
  3. Three weeks out: circulate answers to every bidder at once
  4. Two weeks out: bids due
  5. One week out: board review, reference checks, finalist interviews
  6. Award with at least two weeks before the start date so the incoming contractor can walk the system before taking responsibility for it

Awarding a contract that starts the following Monday is how transitions go badly. The new crew needs time to find the controllers and learn the property.

For what a complete scope typically covers on a common-area contract, see our maintenance services and our HOA and community association scope.